LESCO New Connection
Are you trying to find a thorough how-to for obtaining LESCO’s new connection? This post walks you through the process of obtaining the new LESCO connection step-by-step. All you need to do is complete the application form, making sure to meet all the conditions. You can easily receive your new connection by following the instructions, so don’t worry.
You don’t have to wait in line to apply for a new power bill connection if you live in Lahore. You may do it from the comfort of your home. All you need is a mobile device and an internet connection to apply online for a new connection with Lesco. Let’s talk about applying for a new electrical connection right now.
Download LESCO New Connection Application Form
You can download the Lesco application form here.
Key Subdivision Information for LESCO New Connection
Here are the key subdivisions of the LESCO new connections.
Distribution Type
Select one of the distribution companies. For instance, if you wish to apply for a new electricity connection with LESCO, choose LESCO from the dropdown menu. This can be easily accomplished through a simple process.
Category Type
In this step, you need to choose a category based on your power load in kW and select your desired load from the dropdown menu.
Sub Division
Choose your subdivision from the dropdown menu. Before making your selection, ensure that you are aware of your subdivision.
Neighbor’s Reference Number
Enter your neighbor’s bill reference number in the field.
Note– If there is already an electricity connection at the premises, please provide the reference number of that connection instead of your neighbor’s.
Connection Type
Choose your connection type from the available options. The options are:
- Domestic
- Agriculture
- General Services
- Commercial
- Tubewell
- Electrification Colonies
- Industrial
- Street Lights
- Temporary
- Corporate Company
Note– If you are applying for a corporate company, industrial, or commercial connection, you must provide the NTN (National Tax Number) and STRN (Sales Tax Registration Number).
Procedure for LESCO New Connection Online 2024
You must use the online application site or the ENC (Electricity New Connection) system to submit an online application for a new connection. You have to fill out all the necessary fields, making sure that the data you provide is true. Please be aware that the ENC does not accept false information.
Kindly include the applicant’s complete name, which provides for their father’s name. Additionally, state if the land is yours or if it is a rental.
Select whether you are a foreign national or a citizen of Pakistan on the Lesco application form.
Kindly let us know your full current address, CNIC, and phone number. You also need to supply a different mobile number.
After that, you must give the contact person’s details so that they can get in touch with you if necessary. This contains the name, email address, mobile number, and relationship to the applicant of the contact person.
Next, give the address where you wish to build the new electrical connection, the number of already installed meters, and the minimum load expressed in kWh.
After carefully reading the terms and conditions, check the box next to “I Agree” and press the “Submit” button.
Procedure for LESCO New Connection by Hand
- Step 1: To begin with, print the application for a new connection from LESCO online or at your local LESCO office.
- Step 2: After that, carefully read the application form and fill it out in accordance with its requirements. Please affix the necessary paperwork.
- Step 3: Next, send this form to the LESCO office that is closest to you. LESCO then confirms your form after that. Processing of the application may take up to 15 days.
- Step 4: You will receive a demand notice after your form has been confirmed. After that, you must pay the fees and include any other paperwork that is needed.
- Step 5: At last, you are able to obtain your new LESCO connection.
Requirements for LESCO New Connection
Here are some requirements for LESCO bill connections.
Attachments
Here, you need to upload the following attachments in JPG/PDF format. Ensure that the file size of each upload does not exceed 300 KB.
Property Document Copy
In this context, you are required to provide evidence of ownership, such as a registry, farred document, allotment letter (if applicable to a housing colony). All provided documents must bear authentication from either an oath commissioner, notary public, or a Class One officer.
Get Print of Lesco Online Application Form
You should obtain a printout of your submitted application form and attach all the mentioned documents to it. Then, send or submit this comprehensive file, including the application form and required documents, to the relevant office.
Issuance of Demand Notice
Once your submitted documents and information have been verified, LESCO will issue a demand notice.
Demand Notice Fee
Your next action is to make the payment mentioned in the LESCO demand notice at the designated bank. After making the payment, you must submit a copy of the demand notice to the appropriate office for further processing.
Meter Installation
In the final stage, the relevant office will review the payment verification of the demand notice, and upon verification, they will proceed with the installation of the connection.
Attested Copy of Applicant’s CNIC: It is needed in Single phase meter connection.
Attested CNIC Copy of Witness: It is required in three phase meter.
LESCO New Connection for Industrial and Corporate Company
For the installation of an industrial connection, you must provide additional documents in addition to all the other attachments mentioned earlier, such as
Affidavit Form Copy
(as per the template available at the relevant office on Stamp Paper and duly verified by an Oath Commissioner) confirming the absence of an existing electricity connection at the requested location and the absence of any outstanding debts. However, should any outstanding dues be discovered subsequently, the applicant will be responsible for settling those debts first.
Resolution from board of Directors in favors of signatory
In cases involving multiple owners, a power of attorney must be provided in favor of the individual submitting the application on behalf of the other owner(s). This power of attorney should be executed on stamp paper as per the provided specimen and duly attested by an Oath Commissioner.
Certified of Memorandum od Articles of Association
Plan to establish a company in Pakistan, you must submit the memorandum to the company registrar at the Securities & Exchange Commission of Pakistan (SECP) in accordance with the Companies Act of 2017.
Certified True Copy of Form-29
Utilizing Form 29, you are required to notify the SECP Company Registration Office regarding any alterations in the officers of your company or any modifications in their details. This particular form is among the frequently submitted forms to the SECP. As per Section 197 of the Companies Act of 2017, it is mandatory for every company to keep a record of its officers.
Time Required for LESCO New Connection Voltage Wise
Category | Time Required |
Voltage level upto 400V and Load Upto 15 kW | 30 days |
Voltage level upto 400V and Load upto 70 kW | 53 days |
Voltage level upto 400V and Load upto 500 kW | 73 days |
Voltage level 11 or 33 KV and Load upto 5000 kW | 106 days |
Voltage level upto 66 KV and Load above for all loads | 496 days |
Pay Attention! Now in 2023, LESCO revised the single-phase connection charges from Rs. 7,400 to Rs. 93,000, and for three-phase connections Rs. 33,500 to Rs. 235,000.
Conclusion
The online application for a new connection in Lahore will assist you in applying for a new electricity connection in a hassle-free manner. All the necessary documents required to apply online for a new Lesco electricity connection have been discussed. You’ve also been provided guidance on both single and three-phase electricity meter connections. We hope you now have a clear understanding of the online application process for a new meter connection in Lahore.